Projets

Albert Heijn

  • Zwevegem
  • Démolition

An exceptional collaboration between the architects BVDL and Prime about an impressive project in Zwevegem. This is a project of high quality with its characteristics due to the design and execution efficiency.

The detailed analysis of the basic aspects:

  • Démolition respect de l’environnement : démolition sélective dété réalisée avec une attention particulière pour les riverains. Pour minimiser of the nuisances, and take the time to choose the treater of the waste on the Deva Recycling site.
  • Cycle of materials durable : the debris are carried out during a second period and the windows are used for the construction of the plate-forme de travail, contributing to a circular construction.
  • Efficient station infrastructure : a permanent station space of more than 3000m², designed and a time record, to be taken into consideration for the project functions.

This collaboration illustrates the excellence of the commentary expertise, durability and effectiveness of a modern construction project.

Nous discutons ensemble de votre projet.

Prêt à réaliser votre projet ? Contactez-nous ou demandez directement un devis !

Detegro bv
050 24 07 59
Schatting 56 8210 Zedelgem
BE 0787.151.436

Commander du terre végétale

Saisissez vos coordonnées ci-dessous. Nous vous contacterons dans les plus brefs délais !

Vous aimeriez obtenir un devis ?

Complétez vos données ci-dessous. Nous vous contacterons dans les délais les plus brefs !

Contactez-nous

Complétez vos données ci-dessous. Nous vous contacterons dans les délais les plus brefs !